MANUFACTURING IMPROVEMENT MADE EASY BY VORNE
CONTACT US

XL600 Legend Plates

Image of the XL600 display.
XL600-3T (3-Line, Tricolor LED)

Tailor the XL600 to your application with interchangeable legend plates featuring terms of your choice. We have dozens of standard terms to choose from as listed below. Custom terms are also available – please consult the factory. These legend plates have been designed specifically for the XL600 and in just seconds can easily be replaced in the field. Each legend plate features bold white heavy duty vinyl lettering, measures 15.6″ x 3.0″ and is secured with 4 machine screws.

Standard Terms - Alphabetized

A

Accepted

Accidents

Actual

Actual / Hour

Actual / Shift

Availability

Average Cycle

Average Rate

Avg. Speed

C

Count (Hour)

Count (Shift)

Current Cycle

Current Shift

Cycle Time

D

Date

Day

Difference

Down Time

E

Efficiency

Event DT

F

Feet / Min

G

Goal

Goal (Daily)

Goal (Hour)

Goal (Job)

Goal (Monthly)

Goal (Shift)

Goal (Weekly)

Good Count

L

Last Cycle

Last Hour

Last Shift

Line 1

Line 2

Line 3

Line 4

Line Speed

M

Machine

Month

N

Next WO

O

OEE %

P

Pace +/-

Performance

Pieces to Goal

Q

Quality %

R

Reject Count

Rejected

Run Rate

Run Time

S

Scheduled

Scrap %

Setup Time

Shift A

Shift B

Shift C

Shift DT

Standby Time

T

Takt Target

Takt Time

Target

Target / Hour

Target Count

Target Cycle

Time

Total Count

Total DT

Total Feet

Total Time

Total Yards

U

Unit Count

Up Time

Up Time %

V

Variance

W

Wait Time

Week

Week Target

Weekly Total

WO

Work Order #

WIP

Standard Terms - By Category

Asset

Line 1

Line 2

Line 3

Line 4

Machine

Counts

Accepted

Accidents

Actual

Actual / Hour

Actual / Shift

Count (Hour)

Count (Shift)

Good Count

Reject Count

Rejected

Total Count

Total Feet

Total Yards

Unit Count

Weekly Total

Cycle Times

Average Cycle

Current Cycle

Cycle Time

Last Cycle

Target Cycle

Goal

Goal

Goal (Daily)

Goal (Hour)

Goal (Job)

Goal (Monthly)

Goal (Shift)

Goal (Weekly)

Pieces to Goal

Scheduled

Miscellaneous

Next WO

WO

Work Order #

WIP

OEE

Availability

OEE %

Performance

Quality %

Production Times

Down Time

Event DT

Run Time

Setup Time

Shift DT

Standby Time

Total DT

Total Time

Up Time

Up Time %

Wait Time

Quality

Quality %

Scrap %

Rates

Average Speed

Average Rate

Feet / Min

Line Speed

Run Rate

Shift

Current Shift

Last Shift

Shift A

Shift B

Shift C

Shift DT

Target

Difference

Efficiency

Pace

Target

Target / Hour

Target Count

Takt Target

Takt Time

Variance

Week Target

Time and Date

Date

Day

Last Hour

Month

Time

Week

Try Vorne XL FREE today with zero risk
XL-810
This is XL. It's an all-in-one device that integrates a scoreboard, production monitor, database, and browser-based reporting suite. Everything you need to monitor and improve production.
What's included in your 90-day XL trial:
  • 1 Vorne XL device
  • 1-on-1 product tour (so you can hit the ground running when your XL arrives)
  • Easy self-install guide and dedicated Customer Success Manager
  • Automated, real-time, accurate data and at-a-glance meaningful plant floor KPIs
  • No software to install, no subscription, maintenance, or other recurring fees
GET STARTED
Andon Report
VORNE XL | Works with any machine, any process, right out of the boxEasy, quick self-install | Accurate, real-time KPIs immediatelyTry XL for FREE today
GET STARTED