MANUFACTURING IMPROVEMENT MADE EASY BY VORNE
CONTACT US

OEE

Overall Equipment Effectiveness (OEE) is a fundamental metric to monitor when tracking manufacturing productivity. Learn about OEE from the articles linked below.

OEE Topics

OEE formula where OEE is equal to availability times performance times quality.

OEE Basics

OEE is an abbreviation that in full form represents the manufacturing metric Overall Equipment Effectiveness. OEE takes into account the various sub-components of the manufacturing process – Availability, Performance, and Quality.

timer

4 minute read

All Levels

All time broken down: including schedule loss it becomes planned production time. Including availaibility loss it becomes run time. Without performance loss it becomes net run time. Finally, including quality loss it becomes fully productive time.

OEE As A Tool

OEE measures how close you are to perfect production (manufacturing only good parts, as fast as possible, with no down time). It is a great metric for benchmarking progress in improving manufacturing productivity (i.e., eliminating waste).

timer

8 minute read

Strategic

Try Vorne XL FREE today with zero risk
XL-810
This is XL. It's an all-in-one device that integrates a scoreboard, production monitor, database, and browser-based reporting suite. Everything you need to monitor and improve production.
What's included in your 90-day XL trial:
  • 1 Vorne XL device
  • 1-on-1 product tour (so you can hit the ground running when your XL arrives)
  • Easy self-install guide and dedicated Customer Success Manager
  • Automated, real-time, accurate data and at-a-glance meaningful plant floor KPIs
  • No software to install, no subscription, maintenance, or other recurring fees
GET STARTED
Andon Report
VORNE XL | Works with any machine, any process, right out of the boxEasy, quick self-install | Accurate, real-time KPIs immediatelyTry XL for FREE today
GET STARTED