XL600 Legend Plates
XL600 Kaizen Tool

Tailor the XL600 to your application with interchangeable legend plates featuring terms of your choice. We have dozens of standard terms to choose from as listed below. Custom terms are also available – please consult the factory. These legend plates have been designed specifically for the XL600 and in just seconds can easily be replaced in the field. Each legend plate features bold white heavy duty vinyl lettering, measures 15.6″ x 3.0″ and is secured with 4 machine screws.

Standard Terms – Alphabetized

  • A
  • Accepted
  • Accidents
  • Actual
  • Actual / Hour
  • Actual / Shift
  • Availability
  • Average Cycle
  • Average Rate
  • Avg. Speed
  • C
  • Count (Hour)
  • Count (Shift)
  • Current Cycle
  • Current Shift
  • Cycle Time
  • D
  • Date
  • Day
  • Difference
  • Down Time
  • E
  • Efficiency
  • Event DT
  • F
  • Feet / Min
  • G
  • Goal
  • Goal (Daily)
  • Goal (Hour)
  • Goal (Job)
  • Goal (Monthly)
  • Goal (Shift)
  • Goal (Weekly)
  • Good Count
  • L
  • Last Cycle
  • Last Hour
  • Last Shift
  • Line 1
  • Line 2
  • Line 3
  • Line 4
  • Line Speed
  • M
  • Machine
  • Month
  • N
  • Next WO
  • O
  • OEE %
  • P
  • Pace +/-
  • Performance
  • Pieces to Goal
    • Q
    • Quality %
    • R
    • Reject Count
    • Rejected
    • Run Rate
    • Run Time
  • S
  • Scheduled
  • Scrap %
  • Setup Time
  • Shift A
  • Shift B
  • Shift C
  • Shift DT
  • Standby Time
  • T
  • Takt Target
  • Takt Time
  • Target
  • Target / Hour
  • Target Count
  • Target Cycle
  • Time
  • Total Count
  • Total DT
  • Total Feet
  • Total Time
  • Total Yards
  • U
  • Unit Count
  • Up Time
  • Up Time %
  • V
  • Variance
  • W
  • Wait Time
  • Week
  • Week Target
  • Weekly Total
  • WO
  • Work Order #
  • WIP

Standard Terms – by Category

  • Asset
  • Line 1
  • Line 2
  • Line 3
  • Line 4
  • Machine
  • Counts
  • Accepted
  • Accidents
  • Actual
  • Actual / Hour
  • Actual / Shift
  • Count (Hour)
  • Count (Shift)
  • Good Count
  • Reject Count
  • Rejected
  • Total Count
  • Total Feet
  • Total Yards
  • Unit Count
  • Weekly Total
  • Cycle Times
  • Average Cycle
  • Current Cycle
  • Cycle Time
  • Last Cycle
  • Target Cycle
  • Goal
  • Goal
  • Goal (Daily)
  • Goal (Hour)
  • Goal (Job)
  • Goal (Monthly)
  • Goal (Shift)
  • Goal (Weekly)
  • Pieces to Goal
  • Scheduled
  • Miscellaneous
  • Next WO
  • WO
  • Work Order #
  • WIP
  • OEE
  • Availability
  • OEE %
  • Performance
  • Quality %
  • Production Times
  • Down Time
  • Event DT
  • Run Time
  • Setup Time
  • Shift DT
  • Standby Time
  • Total DT
  • Total Time
  • Up Time
  • Up Time %
  • Wait Time
  • Quality
  • Quality %
  • Scrap %
  • Rates
  • Avg. Speed
  • Average Rate
  • Feet / Min
  • Line Speed
  • Run Rate
  • Shift
  • Current Shift
  • Last Shift
  • Shift A
  • Shift B
  • Shift C
  • Shift DT
  • Target
  • Difference
  • Efficiency
  • Pace
  • Target
  • Target / Hour
  • Target Count
  • Takt Target
  • Takt Time
  • Variance
  • Week Target
  • Time and Date
  • Date
  • Day
  • Last Hour
  • Month
  • Time
  • Week